- A8
- B9
- C10
- D12
Step-by-Step Solution
The first wall takes man-hours for 60 m, i.e. 24 man-hours per metre. A 90 m wall needs man-hours, and 18 men working 10 hours supply 180 man-hours a day, so it takes 2160/180 = 12 days. (Forgetting that the second wall is half as long again gives 1440/180 = 8 days.)
Answer: D) 12