A concrete platform has 10 steps, as shown. Every step is 2 m long, has a tread of ½ m, and rises ¼ m above the one below it; each step is a solid block resting on the ground (the 1st is ¼ m high, the 2nd ½ m, and so on). How much concrete is needed?
Class 10Arithmetic ProgressionsAlgebra — Sequences
A11.25m3
B13.75m3
C27.5m3
D2.5m3
Step-by-Step Solution
Step k has volume 2×21×4k=4km3. Volumes 41,42,…,410 form an AP: S10=210(41+410)=13.75m3.
Answer: B) 13.75m3
Key idea: Inserting arithmetic means
Between two numbers a and b, you can insert k 'arithmetic means' so that the resulting sequence is in AP.
**Setup**: a, m₁, m₂, …, mk,b. Total of k+2 terms in AP, so: - First term = a, last term = b. - Common difference d=(b−a)/(k+1) (because there are k+1 'gaps').
**Example**: insert 3 arithmetic means between 4 and 16. d=(16−4)/(3+1)=3. Means: 7, 10, 13. Check: 4, 7, 10, 13, 16 — d=3 ✓.
Master this chapter in 30 minutes a day.
Don't just memorise the answer — build a daily practice habit.