Practice30Create account

Digging a well costs ₹250 for the first metre, and every further metre costs ₹75 more than the metre before it. What is the cost of digging the 12th metre alone?

Class 10Arithmetic ProgressionsAlgebra — Sequences
  • A₹1075
  • B₹1150
  • C₹7950
  • D₹925

Step-by-Step Solution

The metre-by-metre costs form an AP with , so the 12th metre costs . ₹1150 uses 12 by mistake, and ₹7950 is the total cost of all 12 metres, not the 12th metre alone.
Answer: A) ₹1075

Key idea: Sum of first n terms

**Sₙ = []**

Or equivalently, **Sₙ = **, where is the LAST term (the n-th term).

**Why these are equal**: , so .

**Example**: Sum of 1, 4, 7, …, 28.
First find . From aₙ = 28: → .
Then S₁₀ = .

**Special case natural numbers)**: Sₙ = .
**First odd numbers**: Sₙ = .
**First even numbers**: Sₙ = .

Master this chapter in 30 minutes a day.

Don't just memorise the answer — build a daily practice habit.

Practice 5 Similar Questions Free →

All Arithmetic Progressions practice questions

More Class 10 Arithmetic Progressions practice

An AP has 25 terms and its middle term is 30. What is the sum of all 25 terms?Ravi sums the first 10 terms of the AP 4, 7, 10, … with n/2[2a + (n - 1)d] and gets 175.…A machine bought for ₹60000 loses ₹4500 of its value every year. What is its value at…The first term of an AP is 3 and the sum of its first 9 terms is 171. Find its common…At a timber depot, logs are stacked so that the bottom row has 20 logs, the row above it…