- AThe parcel was posted either on Monday or on Tuesday. Parcels posted on Monday usually arrive by Thursday, and this one arrived on Thursday, so it was posted on Monday.
- BIf the alarm had been set it would have sounded. It did sound, so it had been set.
- CEither the roof or the window is letting in the rain, so both of them should be replaced.
- DThe failure lies either in the switchboard or in the wiring. An electrician has certified the switchboard as sound, so the failure lies in the wiring.
Step-by-Step Solution
The original names two possibilities, rules one out on evidence, and settles on the remaining one. The switchboard argument does the same and is valid on the same terms. The first option slides from what usually happens to what did happen, the second argues backwards from an outcome, and the third draws a recommendation without ruling anything out at all.
Answer: D) The failure lies either in the switchboard or in the wiring. An electrician has certified the switchboard as sound, so the failure lies in the wiring.