Contractor: The bridge repair must be taken up in April, because the river is at its lowest in April. Engineer: The river was lowest in April in eight of the last ten years. In the other two the upstream gate was opened in February, and the river then ran lowest in March. The gate is to be opened again this February. The engineer responds to the contractor by

Competition practiceLogical / Critical
  • Aquestioning the accuracy of the record on which the contractor relies
  • Bshowing that the repair could be carried out at a lower cost in some other month
  • Cgranting the contractor's general rule while pointing to a condition, present this year, under which it does not hold
  • Darguing that the repair need not be taken up at all this year

Step-by-Step Solution

The engineer accepts the eight-in-ten record without demur and then produces the two exceptions and what caused them, showing that this year belongs with the exceptions. That is agreement with the rule plus a reason why the rule is off duty. He never doubts the record, offers no figure for the cost of any month, and does not suggest the repair be postponed or dropped.
Answer: C) granting the contractor's general rule while pointing to a condition, present this year, under which it does not hold

Master this topic in 30 minutes a day.

Don't just memorise the answer — build a daily practice habit.

Practice 5 Similar Questions Free →

All Logical / Critical practice questions

More Logical / Critical practice

Sanitation officer: The complaints about the drain in that lane are unfounded; our gang…Head of a driving school: Anybody who fails the licence test twice will never make a…Manager: The free tea we serve the fitters costs this unit forty thousand rupees a year…A colony's coin-operated drinking water point keeps two records that sit uneasily…The gate register of a sugar mill shows that the weighings recorded at its weighbridge…